Forgotten your password?
Weather Now
10 °

23 Feb 2012

Sunset: 5:38 pm

Weather Tomorrow
7 °

24 Feb 2012

Sunrise: 7:07 am




Call Girl

Talk to our representative

If you have any quick queries, don't hesitate to get in touch with one of our lovely representatives through the live chat system.

Relaxing..

How a Rotationally Hot Tub is Made

A new rotationally molded hot tub's construction is a skilled process, that is carefully monitored at every stage by experienced hot tub engineers. The next few pages will give you an insight into how a rotationally molded hot tub is made.

The Polymer Plastic
A new hot tub will start life as a small heap of polyethylene plastic granules which will eventually be turned into a fully functional hot tub. Polyethylene granules are used so that the new hot tub will not rot, rust or crack this give it an advantage over traditionally constructed Hot tubs. The polyethylene granules are a chemically complex material which has been carefully produced by chemical engineers to ensure the new hot tub is as strong and resistant to the elements as physically possible. They are both UV and Chemically resistant.

The first stage of the production process for the plastics engineer is to mix the polymer compounds to just the right colour for the new hot tub. This will be a carefully measured process using a number of different compounds as to produce an attractive and uniform finish. Once the mix of the Polyethylene compound is complete a measured amount will be poured into a cast aluminum mold and sealed using clamps around the rim of the mould.

The Rotary Moulding Process

The cast aluminium mold for a hot tub is designed and made by a team of Computer Aided Designers at a cost of over £80,000 to ensure that the inside of the hot tub is ergonomically perfect for the human body. The heavy aluminium mold now loaded with polyethelene granules is mechanically loaded onto a tri axis arm ready to be baked in a 30 cubic metre computer controlled gas flow oven. This process will take around one hour at over 350 degrees centigrade constantly rotating on three axis so that all of the polyethelne will adhere evenly to the inside of the mold.

Unlike injection molding this process ensures there are no weak points within the structure and maintains a constant polyethelne thickness throughout meaning rotationally molded hot tubs are some of the strongest in the industry. Once the cooking process is complete, the mold will be removed from the oven and cooled for a further hour using water and air jets. This cooling process is a vital part of the process to allow the chemical bonds in the polyethelene to bond together before removal from the mold.

Once the hot tub is cooled it is removed from the mold using pneumatic air jets it is carefully inspected by a quality control manager for any imperfections that may have occurred in the rotational molding process. If any irreparable imperfections are found the tubs life will end there and it will be ground down to be remolded again.

The Hot tub assembly line

The completed shell of the hot tub is now ready to be married to a trolley to be entered onto the production line. The first stage of the “fitting out process” is to drill all the necessary apertures in the tubs walls for the jets and controls to be fitted. This is done using a diamond tipped rotary drill cutter to within 1/10th of a centimetre by a shell technician.
The technician will, at this point, fit all the water, air jets and lighting as specified by the customer. He will then attach these jets to a pre assembled water and air loom that is connected to the associated manifolds. These looms are pipe work that has been calculated by a hydro physicist to have measured pressure at each of the water and air jets. Now that the hot tub is visually complete all that is left to do is install the heart, lungs and brain of the hot tub (Pump, Air Blower and Control panel). This is done by a electrical engineer and then tested toughly using state of the art computer testing equipment.

Bringing the Hot Tub to life

The hot tub is now complete but before shipment it will go though a rigorous 4 hour testing procedure starting with a 20psi pressure test on all the jets and fixtures. It will then go through a wet testing stage where the tub is filled with water and all functionality is tested beyond normal operational limits.
It is only then that the hot tub is wrapped in a protective plastic cover and delivered to the customer in perfect working order.