How a Hot Tub is Made
Bringing the Hot Tub to life
The hot tub is now complete but before shipment it
will go though a rigorous 4 hour testing procedure starting with a 20psi
pressure test on all the jets and fixtures. It will then go through
a wet testing stage where the tub is filled with water and all functionality
is tested beyond normal operational limits.
It is only then that the hot tub is
wrapped in a protective plastic cover and delivered to the customer in
perfect working order.
<< Back |